GEOLISTING.com USA©
Table USA
HENRY ILLINOIS MINEFA-2 & 1 TORPEDO SANDUNCONSOLIDATEDILLINOIS
Geology:
Mineralization:
There is approx. 3 foot of overburden before hitting 180 feet of FA-2 sand.
Work:
Results:
212 million tons Fa-2 sand
Property Details & Access:
700 acres
Rail on site, port access to Illinois River through municipal port.
Detail Location:
Henry, Illinois serving Chicago by rail and river
Other Comments:
Central Illinois surface mine 200 million tons of mineable material with both rail and river access.
Vendor / Contact:
Kenin L. Edwards
2899 Bartruff Lane, Pekin, Illinois 61554
Phone:  309-360-6989 nill01Submitted 07/08
Back To Top